Futura Center Brescia
It is called “Futura” and optimistically anticipates the Brescia to be. It features two towers with 12 and 14 floors, connected by a suggestive management structure.
The two towers are located in front of the future underground station “Casazza”, included in the same lot of land. The complex houses 16 shops and a supermarket, for a total of 8,000 square meters. The retail activities are all on the ground floor (in front of the underground station) and, not surprisingly, have already been sold. An additional 5,500 square meters are reserved for apartments and offices. The management structure has a “shading system”, made of steel and treated with SISTEMA TRIPLEX to meet the requirements enforced by UNI EN ISO 12944, for the manufactured products installed in environmental corrosion class C3 and guarantee H type durability (over 15 years). Thanks to SISTEMA TRIPLEX the work will retain its original appearance for many years, with regular cleaning and limited maintenance operations.